Plastic Plywood formwork

Original
price: Negotiable
minimum:
Total supply:
Delivery term: The date of payment from buyers deliver within days
seat: Hebei
Validity to: Long-term effective
Last update: 2020-04-21 16:40
Browse the number: 168
inquiry
Company Profile
 
 
Product details

Thickness(mm)

Length*Width(mm)

Weight(kg)

12

1220*2440

22-23

15

1220*2440

26-27

16

1220*2440

28-29

18

1220*2440

32-33


The comparison between plastic formwork and aluminium formwork

1, The aluminum alloy template must be used in standard high rise buildings, in order to reduce the use of costs (construction of a single building below 30 floors is not suggested, only if the phased construction);

2, Every thing must be very accurate whether in the design, or the needs of the owners of the structural drawings and construction drawings if using aluminum alloy template; in addition, size can not be modified; ( while plastic formwrk can be cut according to the need. )

3, One-time investment is high, very expensive.

4, The surface of concrete and aluminum will play a chemical reaction and the plate will not be smooth after several times. small bubbles appear.

5, Aluminum template is not available for the basement construction.

http://www.mtmformwork.com/

Total0bar [View All]  Related Comments
 
more»Other products

[ Products search ] [ favorites ] [ Tell friends ] [ Print ] [ Close ]